PCC Renovations
Township of Langley
- Permit required
- To alter, repair, renovate, relocate or add to a building, finish a basement, or build a secondary suiteTownship of Langley
- Plumbing
- A permit is required to install, change or upgrade plumbing, add fixtures, or replace waterlinesTownship of Langley
- Plumbing exceptions
- No permit to repair/replace faucets or fixtures in place, clear a blocked drain, or swap a hot water tankTownship of Langley
- Electrical & gas
- Not issued by the Township — apply through Technical Safety BC for bothTownship of Langley
- Secondary suites
- A building permit is required for every secondary suite, which must meet municipal and provincial standardsTownship of Langley
Checked September 22, 2026 against Township of Langley. Confirm current rules with Township of Langley or its building line, 604-533-6018.
PCC Renovations in Langley





















